TeraPROOF™ 60SA Membrane

About TeraPROOF™ 60SA Membrane

Siplast® TeraPROOF™ 60SA Membrane is a nominal 60-mil self-adhesive waterproofing membrane designed for post-applied below-grade applications. Backed with an aggressive butyl adhesive that remains stable in high-temperature applications and flexible in low-temperature applications, it allows for installation in most weather conditions without the use of a primer. With exceptional puncture resistance, adhesion, and elongation, 60SA Membrane maintains performance under the stress of building aging, thermal cycling, and structural movement.

Featured benefits

Leak protection icon

Exceptional water hold-out

Per ASTM D5385 to prevent water intrusion below-grade
Certified icon.

Reliable

Temperature stable butyl adhesive with wide application temperature range and continued performance in below-grade applications
Strong protection icon.

Puncture-resistant structural flexibility

Enhanced puncture and tear resistance and elongation to accommodate structural movement and ground pressure

TeraPROOF 60SA Membrane

A self-adhesive waterproofing membrane with a butyl adhesive and split siliconized release liner designed as a post-applied waterproofing membrane for below-grade applications.

Installation

Application

Refer to the Siplast Installation Guide for detailed application information of Siplast TeraPROOF™ 60SA membrane.


Storage & handling

TeraPROOF™ 60SA Membrane should be stored between 40°F - 90°F on a clean, flat surface in dry conditions out of direct exposure to the elements. Pallets should not be double stacked. Material should be handled so that it remains dry prior to and during installation. Use appropriate safety equipment and job-site controls during application and handling. Dispose of unused product and containers in accordance with local, state and federal regulations.

See product packaging and the Safety Data Sheet for specific information on the safe handling of this product.


Packaging

Roll size: 59in x 40ft (200 sq-ft)
Rolls per pallet: 25 (5,000 sq-ft per pallet)

Below-grade waterproofing systems excavation site featuring an earth-retention system.
FEATURED SYSTEMS

Below-grade waterproofing systems

From roofing and waterproofing to walls and below-grade, you have a trusted partner on every side of the building—all covered by one manufacturer for consistency and convenience, and supported by design and field tech specialists ready to help solve your toughest challenges.
Construction specialists reviewing architectural blueprints and building models for complex project planning.
CONTACT US

Navigate complex transitions and connections with guidance

Siplast specialists can help ensure continuity across below-grade, wall, and roof systems while providing insights into systems covering all sides of the building, continuous insulation, and connection details. Meet with one of our specialists to review your project. Simply provide your contact information and schedule a time that is convenient for you.

RISE Blog

Below-grade waterproofing system application.

Factors to Consider When Choosing Below-Grade Waterproofing Systems

View below-grade waterproofing article
Construction site for new building using pre-applied waterproofing membrane material from Siplast.

Different Types of Below-Grade Waterproofing Solutions

View below-grade solutions article
Construction site for new building using pre-applied waterproofing membrane material from Siplast.

Is pre-applied waterproofing right for your project needs?

View pre-applied waterproofing article